cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........11/29/2020
 New Topic  Reply to Topic
 Printer Friendly
Author Previous Topic Topic Next Topic  

sschaer
Moderator

913 Posts

Posted - 11/29/2020 :  14:19:29  Show Profile  Visit sschaer's Homepage  Reply with Quote
work continued on the remaining part of the layout. been building benchwork, glueing down trackbed, installing track. uphill main tracks had to be done first because access will be limited once the downhill trackwork is in place. of course i ran out of glue and screws. as usual. then i ran out of trackfeeders. so fiddling with soldering iron track joiners and wire had to be done first. today trackbed of the downhill route has been glued down. also a few feet of track are in place now.
next big thing will be building the benchwork for the large 270/90 degree curve. 270 degrees to the right, then 90 to the left (downhill). uphill it will be 90 right, 270 left. this part will be free standing in the room. nowhere to attach a few screw. have to figure out a way to make it as stable as possible.
  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.06 secs. Powered By: Snitz Forums 2000 Version 3.4.06