cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........07/12/2015

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 07/12/2015 : 08:43:59
g'day mates

still no hobby room to work on model railroad projects.

at least more things have been done in the house. 2 of 3 bedrooms are finished. laundry room is finished. cellar is finished. garage has been cleaned and repainted. a shed for firewood has been built. kitchen is finished. all walls and ceilings are now painted.

furniture and such for both bathrooms will be delivered coming tuesday. then work will start in these two rooms as well.
flooring work in the living room started yesterday, should be finish by next saturday. as soon as the flooring is done we will be able to move the furniture back in. (currently all stuff from the living room is stored in the two bedrooms)

but there's a little more work to be done before we finally can move in :
- rebuilding the stairs
- handrails along the stairs
- lights in several places

cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.11 secs. Powered By: Snitz Forums 2000 Version 3.4.06