cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........08/21/2016

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 08/21/2016 : 15:36:29
wow...two months since the last wwr. well, work on my new hobby room has still not started yet.
seems like the local building inspector simply doesn't want me to add a new building.

in the meantime i modified some woodland scenics ready-built buildings. installed floors, walls and lots of led for lighting.
work also started on a few more buildings. some are built but unpainted, others are kits. it will take some time before they're ready for some pics.

cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.11 secs. Powered By: Snitz Forums 2000 Version 3.4.06