cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........09/27/2020

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 09/27/2020 : 10:23:10
been spending some time planting grass, bushes, trees on the remaining area of the setup yard part of the layout.
also the street cafe received tables, chairs, people enjoying a drink. i installed a few colored led to provide fancy lighting for the night.

so far all lights are wired and in working condition. a few channels are unused yet. have to think about, where to add more light or other effects. we'll see.

next will be final wiring of the turnouts. mounting servos, dcc controlers, frog feeders and checking of all the tracks and such. once everything works as intended i will most likely cover the whole area to protect it from dust (and "storing" tools on top of the layout).
1   L A T E S T    R E P L I E S    (Newest First)
sschaer Posted - 09/27/2020 : 13:20:37











cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.12 secs. Powered By: Snitz Forums 2000 Version 3.4.06