cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........06/10/2019

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 06/10/2019 : 18:47:40
g'day mates

didn't work too much on the layout recently. seems like summer finally found my little corner of the world. so i focused on a few projects in my garden.

i still managed to rework the north entry of the yard. had to add a new track for the passenger loop-back. therefore i had to add a swingover from main-1 to pax track. now i just need to figure out a smart way to access the pax track from the main yard. unfortunately main-1 and main-1b will be between them.


tracks from left to right :
- pax loop-back/via yard entry
- pay loop-back/via yard exit
- main-1
- main yard entry



the turnout connecting the two pax-loop tracks has to be automated so it switches as soon as a train enters it from the "wrong" track. i'm currently talking to tamvalley to have them build a modified version of their frog juicers.

cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.12 secs. Powered By: Snitz Forums 2000 Version 3.4.06