cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........05/12/2019
 New Topic  Reply to Topic
 Printer Friendly
Author Previous Topic Topic Next Topic  

sschaer
Moderator

941 Posts

Posted - 05/12/2019 :  16:03:35  Show Profile  Visit sschaer's Homepage  Reply with Quote
besides some work in the garden i also found some time to work on the layout. lots of thinking, trying, rearanging track. after all i was not happy with the engine facility. yesterday i decided to move the whole facility to the city side. several advantages. more space for the engine service area and more space for switching on the main yard.
also a special passenger track will be added along the yard. this will give the possibility to run a passenger train without any operator. reverse loop, along the track, another reverse loop. the two necessary turnouts will be controlled by two tam valley decoders and a few reed switches. a train will cross the reed switches and these will "push" the buttons on the controller. should work. but i will build a small proof-of-concept setup.

here's a view of the left side of the engine facility. tracks from front to back :
main 2
main 2b
yard entry
facility tracks
main 1b
main 1
passenger track





  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.08 secs. Powered By: Snitz Forums 2000 Version 3.4.06