cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........12/01/2019

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 12/08/2019 : 12:36:30
been working on the engine facility again. sanding/fueling towers are in place. some track has been laid. oh yes, these are two overland brass towers :-)

quite a busy location.


birds eye view


southeast entry


this old lady saw a lot of miles on the track


here's how the southeast entry will look like. tracks from top to bottom (right side):
- passenger loop
- main 1a
- main 1b
- service tracks 1-6 (refueling/resanding, all tracks thru the shops)
- yard entry (features a resanding/refueling option)
- main 2a
- main 2b


cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.05 secs. Powered By: Snitz Forums 2000 Version 3.4.06