been working on the engine facility again. sanding/fueling towers are in place. some track has been laid. oh yes, these are two overland brass towers :-)
quite a busy location.
birds eye view
southeast entry
this old lady saw a lot of miles on the track
here's how the southeast entry will look like. tracks from top to bottom (right side): - passenger loop - main 1a - main 1b - service tracks 1-6 (refueling/resanding, all tracks thru the shops) - yard entry (features a resanding/refueling option) - main 2a - main 2b