cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........26/09/2021

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 09/26/2021 : 15:33:29
hello all

a good part of the garden work is done by now. still a bit to do but weather is getting wet and cold here. therefore i had some time to work on my various railroad project.

first the cross-over is now fully functional. both turnouts are servo powered and have their frogs powered. did a few test-runs today. works perfect.


yesterday work continued on the sd70acu locos. doesn't seem like much done. but while markus made the cabs fit the shell i drilled a few holes. 28 per cab ... since 26 kits are currently beeing built this means 728 #80 hole just for the cabs !







for all of you unaware of the size of a #80 drill.... here i'm holding a few ...


cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.05 secs. Powered By: Snitz Forums 2000 Version 3.4.06