Note: You must be registered in order to post a reply. To register, click here. Registration is FREE!
T O P I C R E V I E W
sschaer
Posted - 12/08/2019 : 12:36:30 been working on the engine facility again. sanding/fueling towers are in place. some track has been laid. oh yes, these are two overland brass towers :-)
quite a busy location.
birds eye view
southeast entry
this old lady saw a lot of miles on the track
here's how the southeast entry will look like. tracks from top to bottom (right side): - passenger loop - main 1a - main 1b - service tracks 1-6 (refueling/resanding, all tracks thru the shops) - yard entry (features a resanding/refueling option) - main 2a - main 2b