cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........03/22/2020

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 03/22/2020 : 16:21:05
hello folks

another 2 weeks passed. but not too much done. intended to install the backdrop behind the setup yard. so i moved the whole yard away from the wall. at 2x20ft not an easy task. anyways, i managed to get it out of the way. marked the wall, added double sided tape. and unwrapped the backdrop. WTF !!! looks fantastic but it is way too short. after going thru the emails i found out i ordered the backdrop wrong. dammit.

ok, so quickly ordered another one. will probably be here in a week or so. we'll see.

since the yard was away from the wall i continued working on the yard itself. few trees, some grass, some ballasting. the via facility buildings will be installed tomorrow. in the meantime i added streetlights, people, and a roadwork scene on the yards access road.

beside that i managed to add graffiti to two of my freight cars. no pics yet. be patient. i first want to add all the weathering before i shop these two cars.

cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.06 secs. Powered By: Snitz Forums 2000 Version 3.4.06