cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........05/14/2023

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
   

T O P I C    R E V I E W
sschaer Posted - 05/14/2023 : 19:47:46
hello out there...

work continued on my layout since the last work report. i spent countless hours crawling under the layout to do some wiring. as of now all existing trackwork is now wired and powered
mainlines 2 and 3 are fully functional. all turnouts are dcc controled with powered frogs.
mainline 1 is completely wired. turnouts in place but not yet usable. i need to position and adjust the servos, install dcc decoders and frog juicers. it will take a while before the 3rd mainline is finally ready for revenue.

today i finished wiring the engine facility. all turnouts are working and their frogs are powered. a few test run showed that parts of the track are really dirty. guess i have to run the cleaning train for a while.


here's the wiring aka mess that is used to control a few turnouts...guess i need to make it look a bit nicer though




this is the main power distribution panel of my layout. all dcc boosters, track sections, turnout groups are connected here. i know my dad will roll his eyes if he sees this.... maybe one day i will make it look professional. straigh wires, 90deg turns, bundled in groups. oh well...




engine facility is in use now ! once mainline 1 is operational i will start working on the facility building.






cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.09 secs. Powered By: Snitz Forums 2000 Version 3.4.06