cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........10/22/2017
 New Topic  Reply to Topic
 Printer Friendly
Author Previous Topic Topic Next Topic  

sschaer
Moderator

913 Posts

Posted - 10/22/2017 :  19:21:06  Show Profile  Visit sschaer's Homepage  Reply with Quote
work continued on my setup yard. some ballasting, some wiring, some landscaping done. i also started work on a large via rail facility building. it will be part of a 3-track service building. now i need to build the base, add lights and a roof with details such as a/c.

the other end of the yard will feature the rear of a small industrial area. just a few building cut in half. not a lot of detailing needed since only the rear end of the buildings are visible. no windows, no interior, no lights.

last but not least, i poured the road which will connect the via facility with the town.
  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.11 secs. Powered By: Snitz Forums 2000 Version 3.4.06