Posted - 12/15/2019 :  11:14:33  Show Profile  Visit sschaer's Homepage  Reply with Quote
approx 16'000 scale feet of track has been laid since the last wwr. how much this is ? well :

16'000 feet / 160 = 100 feet = 30m.

- trackwork south-east end of the engine facility in place, ballasted and weathered
- return loop of the passenger track runs around the town and back to the main yard now
- the return curve from the engine facility to the main yard is in place.







work will continue in the yard area. first i have to figure out the yard laddes will look like. there need to be some stub tracks which will hold switchers and/or cabooses. also the track towards the engine facility should somehow connect to the yard.

here's a first version.

tracks from bottom to top (right edge) :
- main 2a
- main 2b
- stub track for switchers
- entry into yard
- connection to engine facility
- stub track for switchers
- main 1b
- main 1a
- passenger track


the main yard will consist of 11 tracks and should be able to hold 400-500 cars.
again, the two bottom tracks are main 2a/b, top 3 tracks are passenger loop and mains 1a/b.


  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.16 secs. Powered By: Snitz Forums 2000 Version 3.4.06