little work in the garden left some time working on the layout. assembly of building kits continued. a few of the have been painted. window frames, doors and such have been either handpainted or masked and airbrushed. all of the buildings along the road received some weathering. strikes of rust, dirt, grime along with chipped off paint. installation of lights , floors and walls is ongoing. takes more time than expected.
but still, the first building is glued down, also added a few trees to get a first impression.