cp-forum.net
cp-forum.net
Home | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

 All Forums
 railroad, model railroad, electronics
 weekly work reports
 weekly work report..........01/12/2020
 New Topic  Reply to Topic
 Printer Friendly
Author Previous Topic Topic Next Topic  

sschaer
Moderator

913 Posts

Posted - 01/12/2020 :  09:01:13  Show Profile  Visit sschaer's Homepage  Reply with Quote
hello folks

we're already in the second week of 2020. time really flies. not while at work but while working on the layout.

i managed to install the fascia overhead the setup-yard. temporary setup as i still need to paint the whole thing. also a few adjustments need to be done prior to final mounting.

setup yard = the place where i take rolling stock out of boxes and build trains manually.






i also figured out i need a second route for main 2 to enter the main yard from the north-east side. so here it is. we're talking about the second track from top. main line continues and the crossover diverts to the left.



some slight curves will lead this section of track thru a short tunnel.



where it finally joins the yard entry.




last thing done was pouring the concrete base for the industry at the entry of the yard. unfortunately the very liquid concrete found a few spots to leak to the floor. will most likely need to pour a second coat in some places.

  Previous Topic Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
cp-forum.net © 2010- cp-forum.net Go To Top Of Page
used electrons created this page in 0.16 secs. Powered By: Snitz Forums 2000 Version 3.4.06